Steel construction and steel installations

We set international standards in steel and steel installation construction, mechanical engineering and bridge construction. When it comes to the precise positioning and reliable joining of components, demand for our expertise comes from Austria and beyond. We’ve mastered the balancing act between technical expertise and collaborative support for our clients. This allows us to realise even the most demanding installations, such as aero-acoustic wind tunnels and highly complex bridge designs – thereby paving the way for the future.

New Danube Bridge in Linz - Steel and installation construction
New Danube Bridge in Linz © Gregor Hartl

Steel construction excellence

MCE GmbH

MCE impresses with its highly valued expertise in steel and plant construction, mechanical engineering and bridge construction. The Linz-based company, which calls the aerospace industry home, also has a long history of excelling in the manufacture of training simulators and in structural and composite steel engineering – around the world. Fuelled by unparalleled engineering skills, steel bridges and welded structures are also realised economically and efficiently.

MCE GmbH

MCE impresses with its highly valued expertise in steel and plant construction, mechanical engineering and bridge construction. The Linz-based company, which calls the aerospace industry home, also has a long history of excelling in the manufacture of training simulators and in structural and composite steel engineering – around the world. Fuelled by unparalleled engineering skills, steel bridges and welded structures are also realised economically and efficiently.

New Danube Bridge in Linz - Steel and installation construction
New Danube Bridge in Linz © Gregor Hartl
Steel construction and steel installations

New Danube Bridge in Linz

The HABAU GROUP connects. In Linz, our steel construction expert MCE is building the New Danube Bridge, an important piece of infrastructure for the city. Around 8,000 tonnes of steel are being used for the 400-metre-long, 33.7-metre-wide and 15-metre-high structure.
Steel construction and steel installations

Airbus machine assembly plants

MCE has been a reliable partner to the aircraft industry since 2002. And the professional and timely construction of Airbus’ plants for assembling the machine’s fuselage sections has confirmed that once again.
Steel construction and steel installations

BMW Research and Innovation Centre

A consortium, consisting of MCE and HABAU, is expanding the BMW ‘FIZ’ in Munich. With an aero-acoustic wind tunnel and a development centre for e-cars, the site will play a key part in designing the mobility of the future.
New Danube Bridge in Linz - 24 February 2021 - Floating out the first bridge section © Gregor Hartl
New Danube Bridge in Linz - 24 February 2021 - Floating out the first bridge section © Gregor Hartl
Assembly plants for Airbus
BMW Research and Innovation Centre
The new Energy and Environmental Test Centre - Cold test chamber (05/2010)
1  | 3