Semmering Base Tunnel
ÖSTU-STETTIN played a key role in delivering the Semmering Base Tunnel infrastructure project. Its responsibilities included shaft construction work on Grautschenhof Tunnel and the construction of a heavy-duty transport system, which can be used to transport construction equipment weighing up to 40 tonnes.