IKEA CDC Vienna

Production and assembly in only eight months: Swedish furniture maker IKEA is investing the proud sum of 70 million euros into its new logistics centre in Vienna-Floridsdorf . The two-storey hall spanning an area of 120 x 150 metres required approx. 2,430,000 kilogrammes of reinforcement material, 155,000 kilogrammes of prestressing steel and 12,000 cubic metres of concrete.
IKEA logistics centre under construction in Vienna-Floridsdorf